Mercedes S-Class + Mercedes-Benz Cars of a class S (W-140) + Operation manual + Routine maintenance - Engine Compression check in engine cylinders Engine check by means of the vacuum gage Belt of a streaming drive of auxiliary units + 6-cylinder petrol engines (M104.944 and M104.990/994) + 8-cylinder petrol engines (M119.970/981 and M119.971/981) + 12-cylinder petrol engines (M120.980/982) - 6-cylinder diesel engines (OM603.971) Air purifier - installation details Replacement of a belt of a drive of the generator Removal and installation of a natyazhitel of a belt of a drive of the generator Final collector - installation details Cover of a chain of a drive of GRM Camshaft Removal and installation of a head of the block of cylinders Verification of the control provision of a camshaft Replacement of a chain of a drive of GRM GRM drive - the general information, service of components Natyazhitel of a chain of a drive of GRM - installation details Removal and installation of pistons Check of a condition and replacement of rods Measurement of diameters of cylinders Removal and installation of sleeves of cylinders Check of a condition of a cranked shaft Removal and installation of an asterisk of a cranked shaft Removal and installation of the pallet of a case of the engine The sensor switch of level of oil - installation details Replacement of a chain of a drive of the oil pump Removal and installation of the oil pump Removal and installation of the case of the oil filter + 6-cylinder diesel engines (OM606.961) + Systems of cooling, heating + Power supply system and release + engine Electric equipment + gear shifting Box + Avtomaticheckaya transmission + Coupling + Brake system + Suspension bracket and steering + Body + Onboard electric equipment
|
GRM drive - the general information, service of components
|
The gas-distributing chain can be replaced without engine dismantling. By means of listed below tools the new chain can be connected to old, is passed round asterisks and зачеканена. |
|
At the wrong assembly there can be a collision of valves with the bottoms of pistons! |
General information Details of installation of elements of a drive of GRM
|
1 — Adjusting labels for engine reduction in the provision VMT of the end of a step of compression of the first cylinder 2 — Check correctness of combination of adjusting labels of camshafts 3 — Assembly of a natyazhitel of a chain 4 — At TNVD removal/installation the cranked shaft should be brought into situation 15 ° after VMT of the piston of the first cylinder |
5 — the Bolt of an asterisk of TNVD has the left carving 6 — the Lock bolt 7 — Bolt М11 of an asterisk of a camshaft is subject to replacement in case its adjusting length "X" exceeds limiting admissible value (53.6 mm) 8 — the Bolt of a pulley of a cranked shaft |
For performance of procedures of removal and installation of elements of a drive of GRM the following special tools be required:
Stripper of a nave/pulley of a cranked shaft - No. 103589003300;
Stripper of an asterisk of a cranked shaft - No. 102589053300;
The tool for flywheel blocking / a driving disk - No. 601589024000;
Bolts М6ґ90 of mm for flywheel blocking / a driving disk;
The tool for TNVD blocking - No. 601589052100;
The tool for TNVD division - No. 601589000800;
The tool for a centering of an asterisk of TNVD - No. 601589051400;
Set of links of a gas-distributing chain - No. 602589024000;
Stripper of links of a gas-distributing chain (element 1) - No. 602589023300;
Stripper of links of a gas-distributing chain (element 2) - No. 602589046300;
Stripper of links of a gas-distributing chain (element 3) - No. 602589046301;
The tool for installation of links of a gas-distributing chain - No. 602589003900;
Set of 1 shtampoderzhatel for installation of links of a gas-distributing chain - No. 602589026300;
Set of 2 shtampoderzhatel for installation of links of a gas-distributing chain - No. 602589036300;
The adaptation for chain fixing on a camshaft asterisk - No. 602589014000;
Tool box - No. 602589009800;
The holder of the vyazkostny coupling (series 129/140) - No. 120589140700;
Key of the vyazkostny coupling - No. 111589020100;
The holder of a pulley - No. 603589004000.
Pay attention to the next moments:
If the return is not stipulated especially, turn the engine only in the normal direction;
Observe the efforts of a tightening of fixture stipulated by standards;
At the corresponding complete set do not forget to mark before removal adjusting position of the CKP sensor;
Do not turn a cranked shaft for asterisks of camshafts, and also other asterisks of a drive of GRM;
Do not turn cranked and camshafts at the removed gas-distributing chain;
After installation of phases of a gazoraspredeleniye do not forget to check the TNVD adjusting parameters.
Service of components of a drive of GRM Details of installation of elements of a drive of GRM
|
1 — Adjusting labels for engine reduction in the provision VMT of the end of a step of compression of the first cylinder 2 — Check correctness of combination of adjusting labels of camshafts 3 — Assembly of a natyazhitel of a chain 4 — At TNVD removal/installation the cranked shaft should be brought into situation 15 ° after VMT of the piston of the first cylinder |
5 — the Bolt of an asterisk of TNVD has the left carving 6 — the Lock bolt 7 — Bolt М11 of an asterisk of a camshaft is subject to replacement in case its adjusting length "X" exceeds limiting admissible value (53.6 mm) 8 — the Bolt of a pulley of a cranked shaft |
|
1. Disconnect a negative wire from the battery. 2. For the purpose of simplification of a provorachivaniye of the engine turn out all glow plugs. 3. Bring a cranked shaft into position VMT of the piston of the first cylinder (1). 4. Check correctness of combination of adjusting labels of camshafts (2). 5. Before starting performance of repair procedures remove assembly of a natyazhitel (3). 6. At TNVD removal/installation the cranked shaft should be brought into situation 15 ° after VMT of the piston of the first cylinder (4). 7. Before a reversing of a bolt (5) establish the tool No. 601589051400 aligning an asterisk.
|
The bolt of an asterisk of TNVD has the left cutting. |
8. After removal of TNVD establish a lock bolt (6), - the tool No. 601589052100. 9. At installation of an asterisk of a camshaft track correctness of an arrangement of a directing pin. 10. Before installation make filling of a natyazhitel for what lower it a plunzher down in capacity with impellent SAE 10 and 7-10 oil of times wring out a plunzher. Check smoothness of a course of a plunzher and adequacy of his resistance to compression. 11. Having finished necessary regenerative repair, establish a natyazhitel (3) on the regular place.
|
Bolt М11 of an asterisk of a camshaft is subject to replacement in case its adjusting length "X" exceeds limiting admissible value (53.6 mm) (7) (see an illustration 78.1). 15 Tighten a bolt of a pulley of a cranked shaft (8) with effort of 320 Nanometers (a bolt And classifications 10.9) or 200 Nanometers + 90 ° (a bolt In classification 8.8). |
|
|
|
|