Mercedes S-Class W-140

1991-1999 of release

Repair and car operation



Mercedes S-Class
+ Mercedes-Benz Cars of a class S (W-140)
+ Operation manual
+ Routine maintenance
+ Engine
+ Systems of cooling, heating
+ Power supply system and release
+ engine Electric equipment
+ gear shifting Box
- Автоматичеcкая transmission
   Specifications
   Search of malfunctions - the general information
   - Automatic transmission 722.5
      Removal, check of a condition and installation of the converter of rotation (hydrotransformer)
      Removal and installation of a centrifugal regulator
      Removal and installation of the sensor switch of blocking of a starter (start permission)
      Vacuum knot - installation details
      Removal, service and installation of the secondary pump (AT to No. 3652931)
      Removal and installation of a forward cover with the secondary pump
      Removal and LB3 piston installation
      Removal and installation of a back cover of transmission
      Dismantling and assembly of klapanny assembly of AT
      Dismantling and transmission assembly
      Installation and gap check in multidisk brake В3
      Gap measurement in brake В1
      Coupling of raising transfer
      Removal, installation and check of components of a brake of BS of raising transfer and KS coupling
      Dismantling and assembly of the coupling of a free wheeling
      Dismantling and assembly of planetary mechanisms
      Dismantling and assembly of coupling К1
      Coupling К2
      Lever of the selector of gear shifting
   + Automatic transmission 722.6
+ Coupling
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment



56822268 Сантехнические перегородки


Removal, installation and check of components of a brake of BS of raising transfer and KS coupling

Removal

Design of a brake of BS of raising transfer and KS coupling

86 — the Target shaft
163, 186, 190 — Blocking rings
166 — Laying
168 — Drove
169 — the Persistent bearing
170 — the Crown gear wheel
171 — the Solar gear wheel

172 — Coupling of raising transfer
187 — the Internal disk
188, 189 — External disks
191 — Kulachkovaya a spring
192 — the Piston of a brake of raising transfer
195 — Dempfernaya a spring


 PERFORMANCE ORDER

1. Remove a back cover of a transmission.
2. Remove a leading shaft (86), having removed a lock ring (165).
3. Remove a crown gear wheel (170). Remove laying (166) and the persistent bearing (169) from a target shaft (167). Take drove (168) of a crown gear wheel (170).
4. Remove a solar gear wheel (171) and a crown gear wheel (170).
5. Remove coupling of raising transfer (172) with the block of disks.
6. Take the block of disks of a brake of raising transfer from the case, having removed a lock ring (186).
7. Remove a dempferny spring (195). Remove a blocking ring (190) and a kulachkovy spring (191).
8. By means of nippers take the piston of a brake of raising transfer (192) of the case, remove teflon rings (196), and then a persistent washer (173).

Installation

 PERFORMANCE ORDER

1. Before installation of a persistent washer (173) be convinced that the lubricant opening (shooter) is established in the transmission case.
2. Grease both sealing rings of the piston of a brake of raising transfer (192) transmission oil, press the piston in the case, insert a persistent washer (173) so that the antirotational edge settled down in the case, screw teflon rings (196).
3. Insert a kulachkovy spring (191), establish a blocking ring (190), establish a dempferny spring (195). Establish disks of a brake of raising transfer individually.
4. Carefully insert a support of coupling of raising transfer (17) into a multidisk brake of raising transfer.
5. Carefully insert a crown gear wheel (170) into a brake of raising transfer.
6. Insert a solar gear wheel (171).
7. Insert drove (168) in a crown gear wheel (170), be convinced that the internal persistent bearing (169) took drove, fix the external persistent bearing (169), establish laying (166) on a target shaft (167).

Check of an axial gap between target and intermediate in bulk

 PERFORMANCE ORDER

1. Measure «a» distance from a contact surface of the bearing of a target shaft (86) to an internal ring of the bearing (198) by means of a calliper.
2. Define «b» distance from laying (166) to the roller persistent bearing (169) by a calliper.
3. Adjust an axial gap "with" laying (166), having defined thickness of laying: «a» distance (18.00 mm) - «b» Distance (16.60 mm) = the Difference (1.40 mm) - the Axial gap (0.10 mm) - Thickness of laying (1.30 mm). An axial gap between target and intermediate shaft of 0.10 mm. Laying in thickness 0.1, 0.2 and 0.5 mm are issued.
4. Establish a target shaft (86) and insert a blocking ring (165).

Check of an axial gap between target shaft and a back cover

 PERFORMANCE ORDER

1. Measure «a» distance, having established a measuring disk (028) on a contact surface of a back cover. Define distance from a disk (028) to an internal holder of the ball bearing (67) and the help of a calliper.
2. Establish a measuring disk (028) and a flange. Block a doggie of the parking brake in working situation. Tighten a nut (62) to 100 Nanometers. Establish laying (72).
3. Measure «b» distance between a measuring disk (028) and laying (72).
4. Adjust the axial gap «Е» laying: «a» distance (118.80 mm) - «b» Distance = the Difference (1.90 mm) - the Axial gap «Е» (0.40 mm) = Thickness of laying (1.50 mm). The nominal rate axial люфта between target shaft and a back cover makes 0.40 mm. Laying in thickness 0.5, 0.6, 0.7, 0.8 and 0.9 mm are issued.
5. Remove a measuring disk and a flange.

Gap check in a brake of raising transfer

Gap check in a brake of raising transfer

186 — the Lock ring
187 — the Internal disk
188, 189 — the External disk


 PERFORMANCE ORDER

1. Measure «S» gap. The nominal rate of a gap of a brake of raising transfer lies within a range of 0.5-1.1 mm. Adjust it if it is necessary, by means of laying of a lock ring (186). Laying in thickness 2.0, 2.5 and 3.0 mm are issued.
2. Establish a back cover of a transmission.