Mercedes S-Class W-140

1991-1999 of release

Repair and car operation



Mercedes S-Class
+ Mercedes-Benz Cars of a class S (W-140)
+ Operation manual
+ Routine maintenance
+ Engine
+ Systems of cooling, heating
+ Power supply system and release
+ engine Electric equipment
+ gear shifting Box
+ Avtomaticheckaya transmission
+ Coupling
+ Brake system
- Suspension bracket and steering
   Security measures
   Corners of installation of wheels of the car, road clearance
   - Forward suspension bracket
      Gap adjustment in the bearing of a forward wheel
      Removal and installation of the bottom spherical support
      Check of a condition of the top spherical support
      Replacement of the top cross-section lever
      Replacement of the bottom cross-section lever
      Removal, check and installation of a nave of a forward wheel
      Removal and installation of assembly of a rotary fist
      Removal and installation of a screw spring
      Removal and installation of the stabilizer of cross-section stability
      Removal and shock-absorber installation
      Regulator of a road clearance of a forward suspension bracket - installation details
   + Back suspension bracket
   + Steering
+ Body
+ Onboard electric equipment



56822268


Removal, check and installation of a nave of a forward wheel

Removal

Details of installation of a nave of a forward wheel

5a — the Pin
9 — the Nave
9d — the Nut
9e — a nave Cover

9i — the Bolt
9m — the External konusny roller bearing
35 — the Back protective guard
023 — the Stripper


 PERFORMANCE ORDER

1. Remove a forward wheel.
2. Remove and check a brake disk.
3. Uncover (9e) naves.
4. Weaken a bolt (9i), unscrew a nut (9d) and remove the external konusny roller bearing (9m).
5. Remove a nave of a forward wheel (9).

Check

 PERFORMANCE ORDER

1. Check a back protective guard (35), in case of need make replacement.
2. Check a pin (5a) on lack of wear on saddles of the bearing or a contact surface of sealing rings.
3. Check the konusny roller bearing, its rings and sealing rings.

Installation

Installation is carried out as it should be, the return to removal. Amount of greasing for a nave: in a cover - 15 g, total - 60 g.