Removal and installation of a forward cover of a transmission
Details of installation of a forward cover of a transmission
92 — the Forward cover of a transmission 92a — the Bolt 93 — the Epiploon 94, 96 — Laying
100 — РКПП 150 — the Bearing of switching off of coupling 155 — the Lever of switching off of coupling
Removal
PERFORMANCE ORDER
1. Fix a transmission on a support.
Installation
3. Further installation is carried out as it should be, the return to removal.